Phase three > Overview


142 Piles have been constructed for the foundation of the tower in phase three.The piles have been executed in
3 types. 120 of the piles includes more than 21 meter Depth and 1.20m diameter called type one. 8 of them have 1m diameter and like the former type, have more than 21 meter Depth called type two and The third type includs 14 of the piles with more than 15 meter length and 1m diameter.
Totally more than
2969 meter Depth excavation has been executed and more than 3757.8 m3 Concrete has been applied for the piling section.Also more than 367225.26 kg Armature used for the piles of the project. for more information also click on this hyperlink ..